| Kythnos micro grid
      Laatst geactualiseerd op 30 november 2009Eilanden en recreatieparken krijgen van de EU nog de ruimte om zich niet te laten overmeesteren door EdF en EON. Zo mag het Griekse Kythnos ook wat experimenteren met decentrale energieonafhankelijkheid.  
 Kythnos. Supply of 12 buildings.  Eén van de 12 aangesloten huizen op Kythnos
 
        The test site is a small 
          settlement of 12 houses.Generation:
          5 PV units connected via
          standard grid-tied inverters.
          A 9 kVA diesel genset (for
          back-up).
 
                Storage:
          Battery (60 Volt, 52 kWh)
          through 3 bi-directional
          inverters operating in
          parallel. 
                Monitoring: Data logging
          equipment. 
 Technische uitdagingen
         Test decentralized control in a real
          environment with the aim to increase energy
          efficiency. 
        Technical challenges of the Multi Agent
          System – test negotiation process. 
         Test novel features in MAS implementation
          including communication capabilities. Load controlZon genoeg op Kythnos. Maar je moet de energie zo veel mogelijk gebruiken als die beschikbaar is. Belangrijke verbruikers zijn de waterpompen. Door de werking van deze pompen af te stemmen op de beschikbaarheid van zonnestroom kan diesel worden bespaard. Daartoe worden de 12 huizen uitgerust met een systeem voor load control.  
 Wat hebben ze geleerd op Kythnos? 
   Fully satisfactory performance of the Load Controllers with
    embedded processors to host the agents. Novel techniques successfully tested, such as: negotiation
    algorithms, wireless communication, CIM based ontology etc... Key issue the communication among the Load controllers.
    Problems in Wi-Fi (due to humidity) and in the PLC (system
    frequency near 52Hz) affected the system although this did not
    affect the citizens. The Java applications require
    a lot of memory Architecture too complex for
    such small systems, but
    offering great scalability. Dus eigenlijk: de schaal van 12 woningen is te klein. Toch maar beter werken op meso niveau?  En verder? 
   The majority of users would prefer a connection to the public grid; they have not
    developed a special attachment to their PV powered microgrid system.Users do not consider taking responsibility for the system or becoming the owners
    of it, because they are there only during summer vacations and they lack technical
    knowledge. Need for local support (technician)The system operator (CRES) has tried to offer a similar energy service to the users
    as the public grid and this was not possible, because the conditions and expectations
    are very different. Ecological aspects have not been sufficiently appreciated; users do not see the
    advantages and the special value of receiving a green energy supply. Dus dit soort experimenten moet je niet op vakantie-eilanden doen. Maar gewoon op  grote schaal, in een real life omgeving  en op professionele wijze. Jammer dat de EU het alleen laat gebeuren in recreatieparken en op eilanden :-( Geschikt voor toepassing op grotere schaal
   Microgrids operation – the way to unlock the full benefits of DER inisolated systems. The coordinated operation of several DGs and Loads
 (Consumers) increases the efficiency and provide opportunities for better
    network management.
 Decentralized MAS based control well suited to manage multitude of DERs
    and flexible loads with conflicting objectives and different ownerships Decentralized control provides cheap solutions,
    with low communication requirements,
    without need for central operator The solution provides ‘plug and play’ capabilities The approach is suitable for large scale systems 
 KEMA over KythnosAn interesting example of a micro-grid scheme that has been successfully deployed is in a
  small valley on the Greek Island of Kythnos. The system in Gaidouromantra, is a single
  phase micro-grid composed of the overhead power lines and a communication cable running
  in parallel electrifying 12 houses. This network is used to test centralised and decentralisedcontrol strategies in islanded mode as well as communication protocols that are a major
  challenge for such micro-grids.
  The innovation was initiated by a combination of a manufacturer and research institutions.
  The manufacturer was developing products for the operation of power electronics for
  autonomous electricity supply systems and needed a field application to test and develop the
  hardware and control strategies. The research institutions contributed to the development of
  the micro grid concept, the control strategies, the monitoring and the analysis of the data.
  The commercial driver comes from the social and environmental need for the electrification
  of small settlements in remote areas based on local renewable resources, mainly Renewable
  Energy Sources, where conventional power supply systems are too expensive to install,
  operate and maintain.  The benefits obtained from the project were technical, scientific and commercial for the
  involved institutions and local residents report they are satisfied from the electricity service
  provided. The power electronics manufacturer (DC to AC inverter6) gained experience for the
  developed products and owing to the publicity and good operation of the system has opened
  new markets. We understand that several hundred new installations of similar inverter
  systems have followed, which is an example of paving the way for roll-out. With the
  experience and knowledge gained, research institutions have gone on to participate in new
  R&D projects broadening their expertise.  It is reported that one of the challenges that occurred during the implementation was the fact
  that consumers were not adequately involved in the management of the micro-grid and as
  such they had the tendency to overload the system. This led to some shut downs in the
  summer period, when all the residents are present and increase the energy demand. It was
  found that the consumers do not have the necessary technical competence to take over the
  responsibility for managing the electrical micro-grid system even at a basic level. Currently
  there isn’t a viable scheme for the operation of the system by the users, which may be a key
  issue to address for remotely located systems. The energy supply follows the model of the regular energy service provided by the local electricity utility, although the network conditionsand the basis of the energy supply are very different.
  The initial installation was financially supported by a European Union program (JOULE)
  followed by further financial support within the EU Framework Program VI. The investment
  cost in terms of hardware and installation of the infrastructure including a 3-phase low
  voltage grid with a total length of about 700 m for the electrification of 12 holiday houses was  €280,000. This excludes the cost of monitoring equipment and the work of the engineers of
  the project consortium institutions that designed and implemented the project.     |